Drupal 10 Migration: Santa Barbara Museum Gained 160% Speed & Stability

The Santa Barbara Museum of Art (SBMA) is one of the leading art museums on the West Coast, serving an audience of approximately 70,000 annually. SBMA offers a wide range of educational and interpretive programs designed to engage diverse communities and promote the value of the visual arts.
 
Client’s Objectives
  • Migrate the website from Drupal 7 before end-of-life to maintain security and stability
  • Preserve existing design and core functionality to ensure continuity
  • Improve site responsiveness and page load performance
  • Ensure long-term scalability for future digital initiatives
  • Strengthen website security by using the latest supported CMS version
Clients-challenge
Client’s Challenge:

SBMA’s website was originally built on Drupal 7 and hosted on a Pantheon server. While it included basic event creation features, the site was nearing a critical vulnerability due to the following challenges:

  • Drupal 7 approaching end-of-life in 2024, leaving the site exposed to potential security threats and compatibility issues
  • Risk of business disruption without ongoing module and security updates
  • Limited scalability, making future enhancements and integrations difficult
  • Poor performance metrics, including a site speed stuck at 30%, affecting user engagement
  • A pressing need to modernize without redesigning from scratch, ensuring continuity for museum patrons and internal teams

How we solved
The Solution We Implemented:

To address the urgent needs of SBMA, we delivered a strategic migration from Drupal 7 to Drupal 10.3.2, hosted on AWS. Our approach was focused on preserving design, improving stability, and laying the foundation for future growth.

Technology Stack:
  • CMS: Drupal 10.3.2
  • Hosting: AWS
Key Implementation Highlights:
  • Full migration from Drupal 7 to 10 while retaining original design and core features
  • Migration aligned with Drupal best practices to ensure data integrity and content consistency
  • Updated all modules and dependencies, eliminating legacy vulnerabilities
  • Built-in scalability and flexibility to support future feature rollouts
  • Ensured mobile-first responsiveness for better public engagement
  • Improved backend structure for editor-friendly content management

Impact on client
Impact on Client’s Business:

The results were substantial and future-proofed SBMA’s digital platform:

  • 160% increase in website speed — load time improved from 30% to 78%, greatly enhancing visitor experience
  • 100% reduction in end-of-life risk — migration to Drupal 10 eliminated all critical security threats
  • 30% improvement in operational efficiency — with simplified content management and editor workflows
  • Boost in user engagement and conversions — due to responsive UI and improved loading speed
  • Future-ready architecture — allowing seamless enhancements, integrations, and growth without rework

 
Closing thoughts

By upgrading to Drupal 10, the Santa Barbara Museum of Art secured a high-performing, secure, and scalable platform—ready to serve modern digital audiences. With an elegant migration that preserved their brand integrity, they now have a reliable foundation to support future events, programs, and exhibitions.

Still on Drupal 7 and facing the EOL cliff?

Let’s talk. We’ll help you migrate without missing a beat.